Projects

We got years of experience working on various NZTA or local council complex construction projects and have successfully proven on those projects as Lead planners, Consultants, Traffic managers, etc. Companies trust us to help them keep moving forward. Below is an example of some projects we worked on:

Clevedon Water & Waste water project

Construction of water and wastewater networks in Clevedon through to Takanini. The water will be supplied by the Ardmore Water Treatment Plant in Creightons Road. The wastewater network will be a vacuum system similar to Kawakawa Bay, with wastewater being transported via Papakura for treatment at the Māngere Wastewater Treatment Plant.

Christchurch Northern Corridor (CNC)

This project combines Waka Kotahi NZ Transport Agency’s Northern Arterial (a new section of SH74 running from just south of the Waimakariri River to QEII Drive near Winters Rd) and two Christchurch City Council projects that link QEII Drive to Cranford St and four-lane.

We were heavily involved in this project producing and managing the overall traffic management strategy, design, and execution. This project called for numerous unique solutions such as specialist horizontal geometric design and the use of a permanent guardrail as a temporary barrier system to reduce cost and improve safety.

Western Belfast Bypass

The Western Belfast Bypass (WBB) is a new four-lane, median separated motorway bypassing Belfast and running from the existing Northern Motorway to join Johns Road south of The Groynes entrance.


We were involved heavily in designing Temporary Traffic Plans for the project and providing Temporary road safety barriers solutions for this project from start till the end of the project. This is the first project to use steel barriers on South Island.

North Canterbury Transport Infrastructure Recovery (NCTIR)

The damage caused by the 7.8-magnitude November 2016 Kaiōura earthquake to the Main North Line railway and SH1 along the east coast of the South Island was unprecedented in New Zealand. The North Canterbury Transport Infrastructure Recovery alliance was set-up to restore the road and rail networks.

We have been supporting the project since inception with complex Traffic Management design, barrier design, barrier installation and inspection, auditing and Traffic Impact Assessments.